首页 体育内容详情
登1登2登3皇冠(www.hg108.vip):Fukushima debris removal delayed by another year

登1登2登3皇冠(www.hg108.vip):Fukushima debris removal delayed by another year

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

环球ug平台卖分www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

登1登2登3皇冠www.hg108.vip)实时更新发布最新最快最有效的登1登2登3代理网址,包括新2登1登2登3代理手机网址,新2登1登2登3代理备用网址,皇冠登1登2登3代理最新网址,新2登1登2登3代理足球网址,新2网址大全。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
 当前暂无评论,快来抢沙发吧~

发布评论